Julia Green
Onboarding Contractors: VDI Was Drastically Delaying Productivity. That’s When Venn Stepped in.
December 9, 2025
Blog
Onboarding Contractors: VDI Was Drastically Delaying Productivity. That’s When Venn Stepped in.
A leading smart-home HVAC manufacturer with thousands of contractors in the field needed a way to enable their users to be as productive as possible – as quickly as possible. They also needed a way to ensure their contractor workforce wasn’t exposing the business to unnecessary risk. A virtual desktop was selected many years ago, […]